banner_inner_img

Project

Projects undertaken by the School

Consultancy projects: (Name of the Project Investigator: Prof. Dr. Asis Mazumdar)

1. Phytodiversity and Land Reclamation Model of WBCF Central Coalfields Ltd.(CCL), Ranchi 1Year, 2006 (Completed)
2. IEE for Discharge of Dry Weather Flow (DWF) To East Kolkata Wetlands (EKW)Kolkata Environmental Improvement Project (KEIP) Kolkata Environmental Improvement Project (KEIP), Kolkata 3 Months,
2006
(Completed)
3. Phytodiversity and Land Reclamation
Model of WBCF
Central Coalfields Ltd.(CCL), Ranchi 2006 (Completed)
4. IEE for Discharge of Dry Weather Flow (DWF)
To East Kolkata Wetlands (EKW)
Kolkata Environmental Improvement Project (KEIP), Kolkata 2006 (Completed)
5. Component Technical Assistance (CTA):
Capacity Building for the Protection of
East Kolkata Wetlands
Asian Development Bank (ADB) 2007(Completed)
6. Rainwater Harvesting and Waterbody
Management Scheme for South City
(Water Management Part)
South City, Kolkata 2007 (Completed)
7. De-silting of Final Settling Tank at
Indira Gandhi Water Treatment Plant, Palta
Kolkata Municipal Corporation (KMC) 2007 (Ongoing)
8. Performance Test for the Raw Water Pipelines
& Intake Pump House of Mejia Thermal Power Station of Damodar Valley Corporation
Damodar Valley Corporation (DVC) 2007 (Completed)
9. Preparation of Comprehensive Rejuvenation
Plan (CRJP) of Rabindra Sarobar, Kolkata
Kolkata Improvement  Trust (KIT) 2007 (Completed)
10. Landscape and Rainwater Harvesting Works for South City, Kolkata (Water Management Part) South City, Kolkata 2007 (Completed)
11. Exploratory Groundwater Boring and Pumping Test on exploratory Wells on Damodar River Bed at Damaliya Village, Ranigang under J.N.N.U.R.M. Asansol Durgapur Development Authority (ADDA) 2007-08 (Completed)
12. Performance Test for the Raw Water Pipelines and Intake Pump House of Mejia Thermal Power Station of Damodar Valley Corporation Damodar Valley Corporation (DVC) 3 Months, 2007 (Completed)
13. 10 MGD Water Supply Project at Raniganj under JN-NURM against the consultation work in connection to “Exploratory Wells on Damodar River Bed at Damaliya Village, Raniganj Asansol Durgapur Development Authority (ADDA) 2 Years,2007-2008 (Completed)
14. Component Technical Assistance (CTA): Capacity Building for the Protection of East Kolkata Wetlands Asian Development Bank (ADB) 1Year, August 2007 – February 2008 (Completed)
15. Assessment of Storm Runoff from Neighborhood and Overall Storm Drainage Planning of Neighborhood for the Project “Eden City” Maheshtala Eden Real Estates Pvt. Ltd. 2008 (Completed)
16. Treatability Study of Distillery Effluent through Bench Scale Laboratory Model for Removal of Colour Riga Sugar Co. Ltd. 2008  (Ongoing)
17. Estimation for Evaluation Study of the various activities undertaken in the 10th Plan Period (2002-07) as per the TOR by Soil and Land Use Survey of India (SLUSI) Soil and Land Use Survey of India (SLUSI) 2009  (Ongoing)
18. Assessment of Storm Runoff from Neighborhood and Overall Storm Drainage Planning of Neighborhood for the Project “Eden City” Maheshtala Eden Real Estates Pvt. Ltd. 2008 (Completed)
19. Preparation of Comprehensive Rejuvenation Plan (CRJP) of Rabindra Sarobar, Kolkata (Water Management Part) Kolkata Improvement Trust (KIT) 2008 (Completed)
20. Treatability Test of ETP outlet Water in the Incirnerator Scrubber Recirculation System at CBMWTF SEMB Rampky Management Pvt. Ltd. 2009  (Ongoing)
21. Treatability Test of ETP outlet Water in the Incinerator Scrubber Recirculation System at CBMWTF SEMB Rampky Management Pvt. Ltd. 2009 (Completed)
22. Evaluation Study of the various activities undertaken
in the 10th Plan Period (2002-07) as per the TOR
by Soil and Land Use Survey of India (SLUSI)
Soil and Land Use Survey of India (SLUSI), Govt. of India 3 Months, March-May, 2009 (Completed)
23. Flow measurement in the drainage channels and testing municipal sewage characteristics like BOD, COD, SS, Total Coliform etc. located at South West Howrah and in Gayeshpur town Kolkata Metropolitan Water and Sanitation Authority, Govt. of West Bengal 2010 (Completed)
24. Surge Analysis of Clear Water Rising Main from Water Treatment Plant at Jalukbari to Main Reservoir at Kamakhya Hill Top Dia Consultants & Engineers (P) Ltd. 2013 (Completed)

 

Research projects

Sl. No. Project Title Name of Agency/
Sponsored by
Duration Principal Investigator
1. Water Resources Management MHRD, GOI 1987 (Completed) Prof. Balaram Bose
2. Land Based Water Resources Management MHRD, GOI 1991 (Completed) Prof. Balaram Bose
4. Nonstructural Measures to Mitigate Flood in the Lower Damodar Basin Dept. of Science & Technology, Govt. of India 1998 (Completed) Prof. Balaram Bose
5. An Analysis of Demand for Water Quality in Arsenic prone areas of West Bengal South Asian Network for Development and Environmental Economics 2001 (Completed) Dr. Debasri Roy (CI)
6. Development of Alternate Sources Potable Water in the Arsenic Affected Areas in West Bengal MRAE, GOI (RGNDWM) 2001 (Completed) Prof. Balaram Bose
7. Impact of Climate Change on Water Resources in the Lower Ganga-Brahmaputra-Meghna Basins in the  Indian Sub-Continent NATCOM Project: Winrock International, UNDP & GEF & MOEF, GOI 2002 (Completed) Prof. Balaram Bose
8. Study of Morphometry and Hydrothermal Analysis of a tropical Shallow lake Jadavpur University Research Grant 2004 (Completed) Dr. Debasri Roy
9. Impacts of Climate Change on Water Availability in the Subarnarekha and Mahanadi River Basins of India- sponsored by Asia Pacific Network Project APN (Asia Pacific Network) 2004 (Completed) Prof. Dr. Asis Mazumdar
10. Hydrological Modelling of a Micro-watershed of Dwarkeswar River using GIS for Preparation of Land and Water Resource Management Plan Women Scientist Scheme, Dept. of Science & Technology, Govt. of India 2005 (Completed) Ms. Purnima Mishra
11. Hydrological Modelling of a Micro-watershed of Dwarkeswar River using GIS for Preparation of Land and Water Resource Management Plan Women Scientist Scheme, Dept. of Science and Technology, Govt. of India September 2005 – September 2008 (Completed) PI: Ms. Purnima Mishra
12. Development and Application of Low Cost Technology for Augmenting Water in Drought Prone Rural Tribal Areas of West Midnapore TEQIP, Jadavpur University 2006 (Completed) Prof. Dr. Asis Mazumdar
13. Master Plan for Augmentation of Irrigation Facilities and Creation of Diversified / Multicropping pattern of Agriculture / Horticulture etc. including Pisiculture Facilities for South 24 Parganas South 24 Parganas Zilla Parishad 2006 (Completed) Prof. Dr. Asis Mazumdar
14. Revival of Mirik Lake-Hydro metrological aspect for the best designated use,
Darjeeling (Hydrological Modeling Part)
National Environmental Engineering Research Institute (NEERI) 2006 (Completed) Prof. Dr. Asis Mazumdar
15. Selection and Design of Appropriate Structure for Watershed Management around Upper Reach of Dulung Nala in the Subarnarekha Basin at Belpahari, West Midnapore, West Bengal Dept. of Science & Technology, Govt. of West Bengal 2006 (Completed) Dr. Debasri Roy
16. Selection and Design of Appropriate Structure for Watershed Management around Upper Reach of Dulung Nala in the Subarnarekha Basin at Belpahari, West Midnapore, West Bengal Dept. of Science and Technology, Govt. of West Bengal April 2006 – March 2008 (Completed) PI: Dr. Debasri Roy
17. Master Plan for Augmentation of Irrigation Facilities and Creation of Diversified / Multicropping pattern of Agriculture / Horticulture etc. including Pisiculture Facilities for South 24 Parganas South 24 Parganas Zilla Parishad 3 Years,
2006 – 2009
(Completed)
PI: Prof. (Dr.) Asis Mazumdar
18. Feasibility Study on Oil Palm Cultivation in Shifting Cultivation Areas of North Eastern States (Availability of Irrigation Water) of Arunachal Pradesh and Meghalaya Ministry of Environment and Forests, Govt. of India 1 Year,
2007 – 2008
(Completed)
PI: Prof. (Dr.) Asis Mazumdar
19. Feasibility Study on Oil Palm Cultivation in Shifting Cultivation Areas of North Eastern States (Availability of Irrigation Water) of Arunachal Pradesh & Meghalaya Ministry of Environment & Forests, Govt. of India 2007
(Completed)
Prof. Dr.Asis Mazumdar
20. Study to Develop a Manual on Design of Appropriate and Cost Effective Structure for Soil and Moisture Improvement and Conservation in JFM Areas of
Jharkhand State
Ministry of Environment & Forests, Govt. of India 2007
(Completed)
Prof. Dr.Asis Mazumdar
21. Impact of Forestry Plantation on under
NAP on production of hydrological services (Stream Flow & Water Quality) with a
focus on inter and intra-village
institutions related to maintenance of
forestry hydrology
Ministry of Environment & Forests, Govt. of India 2007
(Completed)
Prof. Dr. Asis Mazumdar
22. Carbon Sequestration in an Urban
Area – Kolkata Metro City
Department of Environment, Govt.
of West Bengal
2007
(Ongoing)
Prof. Dr. Asis Mazumdar
23. Carbon Sequestration in an Urban Area – Kolkata Metro City UNDP/ Department of Environment, Govt. of West Bengal 2 Years,
2007- 2009
(Completed)
PI: Prof. (Dr.) Asis Mazumdar
24. Status of Municipal Solid Waste (MSW) Collection, Treatment and Disposal as per MSW Rules in the State of West Bengal WBPCB, Dept. of Environment, GoWB 2008
(Ongoing)
Prof. Dr. Asis Mazumdar
25. Investigation and Remedial Measures for Prevention of Salt Water Intrusion along Coastline of South Parganas (WB) SERC Fast Track, Dept. of Science & Technology, Govt. of India 2008
(Ongoing)
Ms. Sujana Dhar
26. Study on analyzing the impact of forestry cover on the soil fertility and nutrient enrichment in the downstream of the forest fringe areas in regard to crop yield and incentive mechanism for the local communities at the intra-village and inter-village levels in Jharkhand State Ministry of Environment & Forests, Govt. of India 2008
(Completed)
Prof. Dr.Asis Mazumdar
27. Assessment of River Runoff in the Flood Prone River Systems of the Eastern and North-Eastern Regions using HEC-HMS Model and Compare with Drought Prone River Basins NATCOM, MoEF, Govt. of India in the UNFCC Contract No IND0264.05-25/2007-08/WII-675 2008
(Ongoing)
Prof. Dr. Asis Mazumdar
28. Investigation and Remedial Measures for Prevention of Salt Water Intrusion along Coastline of South Parganas (WB) SERC Fast Track, Dept. of Science and Technology, Govt. of India 3 Years,
2008-2011
(Completed)
PI: Ms. Sujana Dhar
29. Assessment of River Runoff in the Flood Prone River Systems of the Eastern and North-Eastern Regions Using HEC-HMS Model and Compare with Drought Prone River Basins.
(Project enabling activities for Preparation of India’s Second National Communication to the UNFCCC bearing contract number IND0264.05-25/2007-08/WII-675)
NATCOM Project Management Cell, MoEF/ UNDP/ GEF/ WII 3 Years,
2008-2011
(Completed)
PI: Prof. (Dr.) Asis Mazumdar
CI: Dr. Pankaj Kumar Roy
30. Study on analyzing the impact of forestry cover on the soil fertility and nutrient enrichment in the downstream of the forest fringe areas in regard to crop yield and incentive mechanism for the local communities at the intra-village and inter-village levels in Jharkhand State Ministry of Environment and Forests, Govt. of India 1 Year,
2008 – 2009
(Completed)
PI: Prof. (Dr.) Asis Mazumdar
31. Assessment of Pollution From Different Sources: Status of Municipal Solid Waste (MSW) Collection, Treatment and Disposal as per MSW Rules in the State of West Bengal West Bengal Pollution Control Board (2008 –2010)
(Ongoing)
PI: Prof. Asis Mazumdar, Jt.PI: Prof. Arunabha Majumder & CI: Dr. Pankaj K. Roy
32. Noise Reduction of Highway Traffic in Kolkata by Tree Belts WBPCB, Dept. of Environment, Govt. of West Bengal 2009
(Ongoing)
Prof. Dr. Asis Mazumdar
33. Harvesting G.W. in Water Scarce Dhengram Village Potka Block, Singhbhum District, Jharkhand MoEF 2009
(Ongoing)
Prof. Dr. Asis Mazumdar
34. Rain Water Harvesting and Conservation Technologies to Combat Land Degradation in Forest Plantation Areas in Bihar State MoEF 2009
(Ongoing)
Prof. Dr. Asis Mazumdar
35. Field Application and Management of Community based Arsenic Removal Units in Rural Areas of West Bengal WTI, Dept. of Science and Technology
(DST), Govt. of India
2009
(Ongoing)
Prof. Dr. Asis Mazumdar
36. Harvesting G.W. in Water Scarce Dhengram Village Potka Block, Singhbhum District, Jharkhand Ministry of Environment and Forests, Govt. of India 2009
(Ongoing)
PI: Prof. (Dr.) Asis Mazumdar
37. Rain Water Harvesting and Conservation Technologies to Combat Land Degradation in Forest Plantation Areas in Bihar State Ministry of Environment and Forests, Govt. of India 2009
(Ongoing)
PI: Prof. (Dr.) Asis Mazumdar
38. Field Application and Management of Community based Arsenic Removal Units in Rural Areas of West Bengal Ministry of Environment and Forests, Govt. of India 2 Years
(2009-11)
(Ongoing)
PI: Prof. (Dr.) Asis Mazumdar, CPI: Prof. (Dr.) Arunabha Majumder, CI: Dr. Debasri Roy, Dr. Pankaj K. Roy, Shri Subhasish Das
39. Status of Municipal Solid Waste (MSW) Collection, Treatment and Disposal as per MSW Rules in the State of West Bengal WBPCB, Dept. of Environment, GoWB 1 Year
(2009-10)
(Ongoing)
PI: Prof. (Dr.) Asis Mazumdar
JPI: Prof. (Dr.) Arunabha Majumder
CI: Dr. Pankaj K. Roy
40. Noise Reduction of Highway Traffic in Kolkata by Tree Belts WBPCB, Dept. of Environment, Govt. of West Bengal 3 Years
(2009-12)
(Ongoing)
PIs: Prof. (Dr.) Asis Mazumdar, Prof. Dipak Ghosh, PC: Dr. Debashis Chakraborty
41. Development of Cost Effective Technology for Recharging in Over-exploited Groundwater Resources in Rural Areas in West Bengal Dept. of Science and Technology (DST), WTI, Govt. of India 6 Months
(2010 –2011)
(Ongoing)
PI: Prof. Asis Mazumdar, Jt.PI: Prof. Arunabha Majumder & Dr. Pankaj K. Roy
42. Development of Appropriate Methods for Safe Disposal of Arsenic-Rich Sludge and Media Dept. Public Health Engineering, Govt. of West Bengal 18 Months,
2010
(Ongoing)
PI: Prof. Asis Mazumdar,  Jt.PI: Prof. Arunabha Majumder & Dr. Pankaj K. Roy
43. Study on Pollution Load Assessment in River Ganga Central Pollution Control Board, Govt. of India 1 Year,
2010
(Ongoing)
PI: Prof. Asis Mazumdar, Jt.PI: Prof. Arunabha Majumder & CI: Dr. Pankaj K. Roy
44. Effect of Climate Change on Water Resources of Damodar and Subarnarekha River Basins in Eastern India Ministry of Water Resources, Govt. of India 3 Years
(2010- 2013)
(Ongoing)
PI: Dr. Debasri Roy, CI: Prof. Asis Mazumdar, Dr. Pankaj K. Roy, Shri Subhasish Das
45. Carbon Sequestration through Afforestation for Mitigating CO2 emission from Thermal Power Station under Carbon Mission Department of Science & Technology, Govt. of India 3 Years
(2010 –2012)
(Ongoing)
PI: Prof. Asis Mazumdar & CI: Shri Sanjoy Bala